04:03 PM Bug #1088 (Closed): IB-->Schedule 1-->Point no.16-->If user selects NO, then this attached document should not appear here
IB-->Schedule 1-->
Point no.16-->If user selects NO, then this attached document should not appear here.
Point ...
arti saraswat
03:45 PM Bug #1087 (Closed): IB-->Schedule-->Point 12--> Both input field in table should accept alphanumeric and maximum 200 character...Point no 13-->should option for Yes and No
IB-->Schedule-->
Point 12--> Both input field in table should accept alphanumeric and maximum 200 character.
Poin...
arti saraswat
12:27 PM Bug #1086 (Closed): IB-->Schedule 1-->Point no.4, 5, 6, 7, 8-->Need to Modify as per client requirement.
IB-->Schedule 1-->Point no.4, 5, 6, 7, 8-->Need to Modify as per client requirement.
!clipboard-202202011214-is1i9...
arti saraswat

01/31/2022

04:47 PM Bug #1085 (Closed): IB-->Schedule 1-->Point no.1-->As per client requirement Input field for point no 1 should have "Special characters and alpha numeric. 200 characters max", City should alphanumeric
IB-->Schedule 1-->Point no.1-->
Issue 1:
As per client requirement Input field for point no 1 should have "Special...
arti saraswat
 